Open Translate Options
Construction Type:
Construction Details

Information from District:

Is there an existing water service on the Property?
*If stub size is unknown, fire sprinkler designer must assume it to be ¾” or pay for District to inspect the stub.
District Stub size inspection (pothole) with $400 Fee for time and materials
District Pressure Review
Paid
Will you install a new fire sprinkler service?
Will you install a new fire sprinkler holding tank?
With booster pump?
Will you expand an existing fire sprinkler system?
Will this property be abandoning an existing water stub for a new water stub?
LOCAL FIRE DISTRICT APPROVAL: TO BE COMPLETED BY THE LOCAL FIRE DISTRICT OR THE EL DORADO COUNTY BUILDING DEPARTMENT ONLY!

Authorized Representative Statement

Customer’s Domestic Water and Fire Line Configuration Preference 

 fire-line-configuration.png

Please Choose 1

Customer to choose which Combined Service Size they want the TCPUD to install

Combined Service Size Chart

Choose 1 Option
Copy Attached
8 + 12 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.